FARP Initial Test

0%
19

FARP Initial Test

FARP Survey™ Course

The number of attempts remaining is 100

1 / 25

What does the acronym FARP stand for?

* per the Draft AFMAN 11-235

2 / 25

What are the various FARP types available on the AF Form 4066?

3 / 25

What organization approves all FARP site certifications?

4 / 25

FARP Surveyors must know how to collect, assess and evaluate obstacles & hazards for FARP and Taxiing operations?

5 / 25

What Form is used to submit a waiver?

6 / 25

For FARP survey sites on UN-improved surfaces what is the recommended Tanker positioning (i.e., axis rotation) to help reduce engine blast on the Hot Refueling Supervisor (HRS) and Receiver aircraft?

7 / 25

What form(s) and/or document(s) are used in addition to the AF FORM 4066 for a Permanent site certification?

8 / 25

Can a Fixed Wing Tanker and a Receiver aircraft EGRESS in the same direction?

9 / 25

A "Permanent" FARP survey expires ______ years after the date of survey?

10 / 25

(Choose ALL that apply) What is the requirement for TANKER and RECEIVER EGRESS?

11 / 25

What is the minimum safe distance required between two CV-22 receivers in a clear visibility environment?

12 / 25

What publication governs ‘Maximum Obstacle Height’ for Operational Landing Zone (LZ) A-Zone and B-Zone?

13 / 25

When does a Temporary FARP survey expire?

* if it's not reassessed before the initial expiration date.

14 / 25

Which of the following personnel should be a part of the Permanent FARP site 'Certification Team'? (per 'current' AFI 11-235, not the Draft 11-235)

15 / 25

Which Jet Propulsion (JP) fuel is strictly made to military specifications?

16 / 25

A Temporary FARP survey certification team will consist of the following personnel:

17 / 25

What Technical Manual contains a list of approved Tanker and Receiver aircraft used in FARP operations?

18 / 25

What does the acronym SFO stand for?

19 / 25

Are you required to provide a Macro and Micro Diagram for a FARP Survey?

20 / 25

What is the distance (in feet)  that must be maintained between drainage ditches/low lying areas and pressurized fuel servicing components to avoid hazards caused by potential accumulation of explosive fuel vapor?

21 / 25

What does the acronym ABFDS stand for?

22 / 25

A FARP Team will provide a spill containment kit capable of absorbing up to how many gallons of fuel?

23 / 25

What is the minimum (e.g., default) size criteria for an Integrated Combat Turn (ICT)?

24 / 25

The minimum distance measurement between a TANKER and a RECEIVER aircraft is determined from . . .

25 / 25

What database must be used to process, approve/disapprove and record assessments for FARP surveys per the Department of the Air Force Manual (DAFMAN) 13-217.

Your score is

The average score is 52%

0%

We value your privacy. Our website uses cookies to enhance your browsing experience and ensure the site functions properly. By continuing to use this site, you acknowledge and accept our use of cookies.

Accept All Accept Required Only