0%
45

FARP Final Test

FARP Survey™ Course

The number of attempts remaining is 100

1 / 41

What does the acronym FARP stand for?

* per the Draft AFMAN 11-235

2 / 41

What is the definition of a FARP operation according to AFI and AFMAN 11-235?

3 / 41

What are the various FARP types available on the AF Form 4066?

4 / 41

FARP Surveyors must know how to collect, assess and evaluate obstacles & hazards for FARP and Taxiing operations?

5 / 41

For FARP survey sites on UN-improved surfaces what is the recommended Tanker positioning (i.e., axis rotation) to help reduce engine blast on the Hot Refueling Supervisor (HRS) and Receiver aircraft?

6 / 41

What form(s) and/or document(s) are used in addition to the AF FORM 4066 for a Permanent site certification?

7 / 41

Can a Fixed Wing Tanker and a Receiver aircraft EGRESS in the same direction?

8 / 41

A "Permanent" FARP survey expires ______ years after the date of survey?

9 / 41

(Choose ALL that apply) What is the requirement for TANKER and RECEIVER EGRESS?

10 / 41

What is the minimum safe distance required between two CV-22 receivers in a clear visibility environment?

11 / 41

When does a Temporary FARP survey expire?

* if it's not reassessed before the initial expiration date.

12 / 41

Are you required to provide a Macro and Micro Diagram for a FARP Survey?

13 / 41

THE Aircraft Turnaround Supervisor (ATS) will be a highly trained and qualified maintenance technician and ______

14 / 41

What is the distance (in feet)  that must be maintained between drainage ditches/low lying areas and pressurized fuel servicing components to avoid hazards caused by potential accumulation of explosive fuel vapor?

15 / 41

What is a key factor in determining when you must complete a separate and distinct FARP survey?

16 / 41

What documentation, and/or references should be utilized during pre-planning efforts prior to conducting a FARP survey?

17 / 41

Can you change any parts of AF Form 4066,  Blocks 30A through 30J, during the REASSESSMENT (for either a Permanent or Temporary FARP)?

18 / 41

Temporary FARP surveys may be extended for ____ year(s), provided the REASSESSMENT is conducted before the expiration date, and there are no changes to Blocks 30A through 30J of AF Form 4066?

19 / 41

What technical manual describes 'Ground Servicing of Aircraft and Static Grounding/Bonding?

20 / 41

If there are NO marshallers available for aircraft ground movement into and out of a FARP site, then _______

21 / 41

How many FARP operations can be conducted on a Contingency certified location?

22 / 41

What are some of the responsibilities of a Panel Operator (PO) during FARP operations?

23 / 41

The 1,000' EGRESS distance requirement for Tanker and Receiver aircraft is measured from __________.

24 / 41

Which example (below) is the most correct statement among the choices given, that should be added to AF Form 4066 if a Temporary FARP for Exercises, does not require an AF Form 813?

25 / 41

(Choose ALL that apply) Which of the following RECEIVERS refuel on the "left side" of the aircraft?

26 / 41

How should information about the Integrated Combat Turn (ICT) be detailed if it is part of a FARP site survey?

27 / 41

Integrated Combat Turn (ICT) survey details are described in what section of the AF Form 4066?

28 / 41

A FARP surveyor should attempt to certify the site for the ______ type tanker aircraft and the ______ number of refueling points the site can support. (Fill in the Blank)

29 / 41

Temporary FARPs supporting Contingency Operations are exempt from requiring:

30 / 41

A Temporary Contingency FARP survey must be on a contingency location, a non-enduring location outside of the United States that supports and sustains operations during named and unnamed contingencies or other operations as directed by an appropriate authority and is categorized by mission life-cycle requirements as initially, temporary, or semi-permanent.

31 / 41

What are some of the responsibilities of Hose Deployment Personnel (HDPs) during FARP operations?

32 / 41

An Integrated Combat Turn (ICT) should ______

33 / 41

If the EGRESS distance is less than 1,000 feet or the area is obstructed, the Tanker or Receiver aircraft will ________

34 / 41

Spilled fuel must not be allowed to drain into a stream, river, or drainage ditch unless the ditch _________

35 / 41

Fire classification Category "B" is mainly used for what type of materials?

36 / 41

The definition of the word "Overlaid" in the context of FARP Operations means _______

37 / 41

When setting up a geographically separated rearming and refueling operation with a single cargo aircraft, what is the optimal order for establishing the two locations?

38 / 41

(Fill In the Blank) ACE is designed to operate within a ________________. This integration helps share resources, enhance regional stability and provide_____________ for basing and operations.

39 / 41

What does the acronym ABFDS stand for?

40 / 41

What is the primary purpose of Rapid Ground Refueling (RGR) in military operations?

41 / 41

BONUS QUESTION:  What is the function of Dry Breaks on each coupling in a refueling system?

Your score is

The average score is 84%

0%

We value your privacy. Our website uses cookies to enhance your browsing experience and ensure the site functions properly. By continuing to use this site, you acknowledge and accept our use of cookies.

Accept All Accept Required Only