Final Exam – Pavement Evaluation

0%
30

Final Exam - Pavement Evaluation Course

If you DON'T know the answer, please DO NOT guess.  Each question has an "I don't know" response available; use this answer instead of guessing so we have a better understanding of your baseline knowledge.

The number of attempts remaining is 1000

1 / 41

How prepared are you to crush this test? (Select all that apply)

2 / 41

What does the acronym PCASE stand for?

3 / 41

What does the abbreviation “ACN” represent?

4 / 41

What is the definition of PCN?

5 / 41

Fill in the Blank:  Potholes of Medium to High severity _________.

6 / 41

For a Landing Zone (LZ) survey with a paved surface, what specific information should be recorded in Block 10b of AF Form 3822?

7 / 41

Which of the following statements is True?

8 / 41

From the APE Results Report (image below), report the PCN Code for the Airfield and identify all of the aircraft that can be safely used for sustained operations.

NOTE: You may use any of your handout material provided in the class this week.

 

9 / 41

Evaluate the following PCASE result: C-146 Wolfhound / 31k / 1,000 Design Factor.

ACN/ PCN Ratio = 0.8 / Allowable Gross Load 14.5k / Allowable Passes 230

10 / 41

If the DCP Hammer drives the DCP rod one (1") Inch with 2 (two) blows, then what is the California Bearing Ratio (CBR) equivalent?

11 / 41

The paved surface 'Potential Ponding' distress must be  _________, in the direction of travel, and _________ than the operating aircraft gear group?

12 / 41

What does the Pavement Condition Index (PCI) measure?

13 / 41

What is the definition of Allowable Gross Load (AGL)?

14 / 41

What is the best way to predict if a paved surface will become de-laminated?

15 / 41

Identify any and all issues with the image below of a PCASE Evaluation report . . .

16 / 41

Which 'Cursory' PCI distress type is exclusively used when evaluating Portland Cement Concrete (PCC)?

17 / 41

Type "A" traffic areas are evaluated for channelized traffic and full design weight of an aircraft for _______________________?

18 / 41

Can a Concrete surface, or an Asphalt surface be evaluated as a semi-prepared surface?

19 / 41

For which type of paved surface is the "strength value" reported as a "K-Value" and "Effective K-Value" instead of using a California Bearing Ratio (CBR)?

20 / 41

The A-400 Atlas utilizes which type of landing gear?

21 / 41

What is the evaluation criteria used in PCASE to determine a paved surface PCN Code?

Translation of the word "Subsequent" = (D) Volgend  / (G) Anschließend

22 / 41

When performing a Pavement Condition Index (PCI) evaluation (for a Contingency Operation), what factors require emphasis during the evaluation?

Translation of Contingency = (D) Onvoorziene / (G)Kontingenz

 

23 / 41

Choose the correct answer for the definition of Alligator Cracking.

24 / 41

Complete the following sentence:  An Expedient - Cursory PCI survey is an . . .

25 / 41

Which CBR Index value is assigned to a subsurface impenetrable layer, or a layer that is not identifiable, after drilling and measuring that the layer . . .

Translation of Impenetrable = (D) Ondoordringbaar / (G) Undurchlässig oder Undurchdringlich

26 / 41

(True, or False) In PCASE, the default property for Rigid Evaluations must be set to 'Shattered Slab'?

27 / 41

The Controlling Reading (located in the center of a 3,600 ft Semi-prepared runway) indicates the analysis show below.  What is the primary reason that the Runway is usable or not usable by the current vehicle selected?

28 / 41

Identify (from the image below), which type of evaluation method has been used to generate Allowable Passes and Allowable Gross Load, and based on the current vehicle shown in the image, if this location can be recommended as Useable?

29 / 41

Identify the two different types of paved surfaces?

30 / 41

Identify any and all issues with the image below of a PCASE Evaluation report . . .

31 / 41

Using the Cursory (Suitability) PCI chart, evaluate the following surface distresses for aircraft Group 3 on an Asphalt Concrete (AC) paved Landing Zone (LZ) runway.

  • Location (Braking Area) : Gravel that is 3/4" of an Inch in size and covers 1,225 square feet of a 5,000 square foot sample area.
  • Location (Turn Around) De-laminated Surface: < 1/2" Inch
  • Location (Overrun) Sharp edge greater than 3/4" Inch
  • Location (Midfield) Depression: Width 3' feet x Length 2' feet. Depth 2" Inches
  • Location (Touchdown Zone): Standing water. Depth 2" Inches. Width 6' feet and 101' feet in length

 

32 / 41

What are the three strength evaluation methods for paved airfields?

33 / 41

Choose the best answer.

34 / 41

Evaluate the following ACN and PCN Code to calculate a ACN/PCN ratio and provide a subsequent recommendation:  ACN 52 / PCN Code 40 / R / B / W / T

35 / 41

(True or False) Each aircraft affects the pavement loading differently, due to its tire configuration, aircraft weight, tire pressure, wheel load distribution, and center of balance.

36 / 41

When conducting a PCI evaluation of a paved Landing Zone (LZ) when do you reduce Allowable Gross Load (AGL) by 25%?

37 / 41

A paved Landing Zones (LZ) is evaluated by applying the same "surface distress" categories and ratings in the same manner as evaluating a semi-prepared Landing Zone?

38 / 41

(Choose all, some, or none that apply)   What document(s) is/are used as source material and references for paved Airfield & Landing Zone (LZ) strength and distress evaluations and reporting requirements?

Choose all that apply!

39 / 41

Complete the following sentence:  A 'Cursory' PCI rating is . . .

40 / 41

Evaluate the following PCN Code's (sub-strength) value for a Flexible pavement:  48 / F / B / Y / U

41 / 41

When analyzing CBR readings within each layer structure, you should . . .

Your score is

The average score is 49%

0%

We value your privacy. Our website uses cookies to enhance your browsing experience and ensure the site functions properly. By continuing to use this site, you acknowledge and accept our use of cookies.

Accept All Accept Required Only